High quality and speed of construction were very important for the success of the work. A fast-paced, but thorough shop drawing process and excellent site supervision by Windham’s Ron Kuusela and Bob Dubios, and follow through by a skilled fabrication and installation team made the work proceed smoothly. The most pressing consideration was to get the job done quickly, while still maintaining a high level of quality. The hotel opening date was fixed, and this was a primary driver for the work. Humidity control in a relatively active construction environment was tricky as well. Coordination of ceiling trim installation, stair assembly and detailing, the main bar and rooftop bar presented additional challenges.