Deadline near for 2018 Pricing Survey
1808fdmcprice3-frameless-built-in.jpg
This built-in urban residential project is just one of five projects in the 2018 FDMC Pricing Survey.

Time is running out for shops to participate in the 2018 FDMC Pricing Survey. The deadline to return bids is Monday, August 20.

The survey is the only industry tool to compare pricing for custom woodwork. Volunteer bidders price the same jobs based on identical bidding specifications and then the itemized bids are published in FDMC magazine and online at Woodworking Network. The result is a revealing portrait of where shops differ on pricing custom work.

This year’s survey includes four different kitchens, including one that was designed for a commercial office. There is also an urban residential built-in project.

You can instantly download the bid package with all instructions. Or you can email [email protected] or phone 203-512-5661 to request a bid package.

All bids must be returned by Monday, August 20, to be included in the survey results, which will be published in the October issue of FDMC magazine.

Maximum participation makes the survey a better tool for everyone, so don’t delay.

 

 

Have something to say? Share your thoughts with us in the comments below.

Profile picture for user willsampson
About the author
William Sampson

William Sampson is a lifelong woodworker, and he has been an advocate for small-scale entrepreneurs and lean manufacturing since the 1980s. He was the editor of Fine Woodworking magazine in the early 1990s and founded WoodshopBusiness magazine, which he eventually sold and merged with CabinetMaker magazine. He helped found the Cabinet Makers Association in 1998 and was its first executive director. Today, as editorial director of Woodworking Network and FDMC magazine he has more than 20 years experience covering the professional woodworking industry. His popular "In the Shop" tool reviews and videos appear monthly in FDMC.