My builder installed wet 5 x 5 beams on the ceiling which will eventually be stained with a matte finish. We intend them to be decorative beams. He installed them before the drywall so that he could attach them from the attic side of the ceiling. How long should I wait before I try to apply finish to the beams since they are wet lumber? Thank you, Andy