Turnkey containerized wood pellet plant produces two tons an hour
Vecoplan-Midwest-CPP.jpg

NEW ALBANY, Ind. - Vecoplan has introduced a containerized pellet plant, called CPP. It can produce one or two tons of wood pellets per hour. The turnkey pellet production plant is housed in standard shipping containers. The CPP is designed, built and shipped from Vecoplan Midwest’s New Albany, Indiana, location.

It comes complete with controls, and arrives on two semi trucks. Users provide a flat 40-foot surface and electric feed to the main panel. A crane is used to stack the containers and the CPP can be up and running production within four hours, according to Vecoplan.

The CPP can be adapted to most existing trailer load out systems, and can process wood, biomass, feed products or anything that needs to be pelleted. The plant can be relocated in a very short time should the need arise. For more information contact Vecoplan Midwest at: 812-923-4992, www.vecoplanmidwest.com.

.

Have something to say? Share your thoughts with us in the comments below.

Profile picture for user karlforth
About the author
Karl Forth

Karl D. Forth is online editor for CCI Media. He also writes news and feature stories in FDMC Magazine, in addition to newsletters and custom publishing projects. He is also involved in event organization, and compiles the annual FDM 300 list of industry leaders. He can be reached at [email protected].